Ghana Highway Authority (GHA)
The Ghana Highway Authority during the year 2010 carried out routine and periodic road maintenance works across the Region.
This covered grass cutting, Ditch and Culvert cleaning, Tree/Bamboo cutting by Single Man Contractors (SMCs); Grading works on Gravel Roads and Pothole Patching on paved Roads both by Local Private Contractors (LPCs) and Direct Labour (D/L) as well as Administrative Cost for supervision.
Periodic Maintenance
Government of Ghana (GOG PROJECTS)
In the 2010 programme year, 27 No. GOG funded roads were maintained and are at various stages of completion with seven (7) No. roads substantially completed.
Donor Assisted Projects
The resealing of the Mankessim – Ajumako road (km10-22) which commenced in 2008 under IDA funding but was transferred to GOG due to funding constraints has now been completed.
Grass cutting: summary of road works – 2010
|
NO. |
ROAD AREA |
NO. AND TYPE |
TOTAL LENGTH (KM) |
ACITIVITY |
|
1. |
Cape Coast |
-5No. (Paved Roads) -5No. (Gravel Road) |
292 120 |
Grass Cutting Grass Cutting |
|
Sub Total |
10 Roads |
412km |
|
|
|
2. |
Winneba |
-9No. (Paved Roads) -4No. (Gravel Roads |
356.1 39.0 |
Grass Cutting Grass Cutting |
|
Sub Total |
-13No. Roads |
395.1 Km |
|
|
|
3. |
Dunkwa |
-9No. (Paved Roads) -8No. (Gravel Roads) |
66.6 187.5 |
Grass Cutting Grass Cutting |
|
Sub Total |
17No. Roads |
254.1 |
|
|
Grading Gravel Surfaces – Summary
|
NO. |
ROAD AREA |
NO. OF ROADS |
TOTAL LENGTH |
ACTIVITY |
STATUS |
|
1. |
Cape Coast |
7No. |
109km |
Grading |
Just Started |
|
2. |
Winneba |
7no. |
78km |
Grading |
Just Started |
|
3. |
Dunkwa |
9no. |
162km |
Grading |
Just Started |
|
|
Total |
23no. |
349km |
|
|
These projects commenced in November, 2010 and are expected to be completed on time.
Department of Feeder Roads
The total length of identifiable feeder roads network in the Central Region is 3148.73km. This comprises of engineered network of 2,286.28km, partially engineered of 386.32km and un-engineered network of 476.13km. The achievements made under various funding sources as at 31st December, 2010 are as follows:
Government of Ghana (GOG)
Routine/Recurrent Maintenance
Out of a planned total of 1,505.65km a total of 689.3km was achieved. This included grass cutting and reshaping activities.
A total of 27.37km was planned for execution. However 3.97km was completed in the year 2010. These projects are at various stages of completion.
Surfacing
A total of 46.09km were planned. 27. 5.0km was completed.. These are at various stages of completion.
Town Roads
A total of 10.85km of roads planned had 2.8km completed. These are at various stages of completion.
Second Cycle Institution
Out of a planned total of 1.42km, the 1.42km was completed.
HIPC
Out of a total of 16.5km planned. These projects are at various stage of completion.
Cocoa Fund
Out of a total of 79.40km only 5.8km was completed during 2010. These road projects are at various stages of completion.
District Capital Road Improvement Programme (DCRIP)
A total of 18.0km of roads were planned. During the year under review 6.0km was completed. These are at various stages of completion.
DANIDA (LSDGP)
A total of 145.68km of roads were planned. However, 107.37km was completed.
DUTCH/UK
Nine (9) bridges were planned during the year. However, two (2) were completed.
ACROW Corporation of America
Four (4) bridges were planned and executed.
SPAINISH
Three (3) bridges were planned and executed.
Challenges facing the Department of Feeder Roads
The main challenges confronting the Feeder Roads Department in the Region are:
The inadequate number of Road Foremen
Inadequate number of monitoring and Supervision vehicles
Road network in Central Region
|
No. |
Surface Type |
GHA |
% |
DFR |
% |
DUR |
% |
TOTAL |
% |
|
1 |
Asphalt |
249 |
27.0 |
0 |
0 |
0 |
0 |
249 |
5.8 |
|
2 |
Surface Treatment |
458 |
49.6 |
378 |
12.0 |
124 |
51.5 |
960 |
22.3 |
|
3 |
Gravel |
216 |
23.4 |
2771 |
88.0 |
117 |
48.5 |
3104 |
72.0 |
|
4 |
Total |
923 |
100.0 |
3149 |
100 |
241 |
100 |
4313 |
|
|
5 |
% |
21.4 |
|
73.0 |
|
5.6 |
|
100 |
|